I see the 19.30 from Wexford is being messed about as a result of on and on-going engineering works north of Greystones. Some time ago it was everlasting OHLE repairs and now it is essential engineering and always with apologies for any inconvenience caused. Does anybody ever use this train or is it run for the benefit of IE personnel. If they ever did in the distant past, they sure won't far into the future. I know that it is all because of ECS working down in the dead of night but surely it could operate as far as Greystones and start back from there in the morning even if IE have to find digs for the driver or whatever.
